during battery manufacturing
During the production of vehicle batteries, force/displacement monitoring of the insertion of the individual cell plates/cell blocks into the cell housing takes place. In order to optimise the cycle time, three units are always joined at the same time, whereby the joining force of each individual plate is recorded and evaluated. Recording and validation take place in the DIGIFORCE® 9307 X/Y process controller. Process results are available to both the station controller and the host to be logged via PROFINET and EtherNet UDP.